1. Shoring and Reshoring Protocols
Temporary structures are often the most dangerous part of the build. The plan must specify the inspection schedule for the installation of shoring (supporting wet concrete) and the procedure for reshoring (supporting curing concrete). This ensures the load is transferred safely as the building rises. You can learn more about the engineering behind this on our Shoring Design Specialist page.
2. Foundation and Earthwork
The plan details the inspection requirements for the soil preparation, pile driving, or shallow foundation pouring. This verifies that the building’s base matches the geotechnical report’s recommendations.
3. Concrete and Reinforcing Steel
This is the bulk of the work. The plan mandates inspections for the placement of rebar (size, spacing, and grade) before any concrete is poured. It also covers the monitoring of the concrete placement itself to prevent voids or honeycombing that could weaken the structure.
4. Structural Connections
For steel buildings or precast concrete structures, the connections are the vulnerable points. The plan will dictate the inspection of welds, bolts, and grout to ensure the building acts as a unified structural frame.